Saturday, February 5, 2011

Return Something Broken

A new start in lane 1

love model train collectors and friends of the HTB!

Again and again I've been asked if it was not possible, photographs of my model show larger buildings, which I will try on this blog. Over the years I put photographs and drawings from the new development model Lane 1 and a current construction activities to be transferred meet the requirements.

The project "Franconian Höllentalbahn in track 1" is the end of 2012 rebuilt as an investment. Here is the example taken into account that the KPEV this section of road on Bavarian soil has built and thus the provisions and materials KPEV, at least until Marx Green, applied and installed. This is also in the system design as its implementation (construction and engineering works, track, signals and signs), is scheduled by them in the model, however, the time represented by 1920 to 1930. The private buildings are / are made in time to 1925 and a driving day of the month with KPEV material is also scheduled. When

has chosen investment theme and the structure of nominal size 1, the S-form proved to be ideal and it is this form is provided for the new project again, albeit slightly modified. At the end of the article shows a small animation that construction alternative and is also Show how the reconstruction is running!


note Blog:
  1. All images in the blog can be represented in almost screen size when you click on them. When you press the command button, the image in a new tab is loaded. I assume, however, that this is known.
  2. to read the disclaimer until the end of the Blog scroll but it also works directly with the PageDown key on the keyboard.

Have fun! Have fun! Que se diviertan! Much pleasure! Удачи!


Let's start with a dummy

dummy service residential building in Lichtenberg / Ofr. size 1
to examine the proportions and the possible "Baufallen."

first sketch of the synthesis of tunnel-bridge-tunnel as a template for further work on the Mac.

next step in planning was this illustration of the old gauge 1 track on my Mac,
the figure shows, however, the latest illustration.

The latest illustration.

on the room size custom illustration for the gauge 1 track. The illustrated length
equivalent to 18 meters and the route is from the Selby Viaduct applied to 1:100.
This section is complete in its execution scale!


from old days and to preview what is coming in 2012





Go to hell!

... is generally considered the most impious desire to get rid of people there, what it lacks in foresight.

However, those who with me goes to hell, it will discover wonderful things that it must be implemented in an attractive investment opportunity. Perhaps this is precisely the Frankish Höllentalbahn located with their neat construction and engineering structures, in a fantastic landscape, precisely those model situation to which some people have waited a long time - so, what happened to me.

I would like to invite all visitors of my blog to thank!



__________________________________________________________________________________

recommendation on the topic:

Review:
Hp1 Issue 17
with my contribution to the model of
former Höllentalbahn in Upper Franconia

Review:
Hp1 Issue 18
with my drawings in scale 1:87
of building and engineering structures of the former
Höllentalbahn in Upper Franconia


more drawings (1:87) and information about the former
stretch one finds in the outputs 19 and 26



0 comments:

Post a Comment